Sign In | Join Free | My burrillandco.com |
|
Ask Lasest Price | |
Brand Name : | No brand |
Model Number : | No model |
Certification : | ISO9001:2008 |
Price : | to be negotiated |
Payment Terms : | T/T. Mould payment terms: 40% Deposit with P.O., Middle Term(first trial)30%, Final Term(before shipment)30%. |
Supply Ability : | based on customer's request |
Delivery Time : | 4-5 weeks |
OEM Plastic Over Moulding White Home Plastic Injection Molding Round Shape
1. Part Description:
Part Name | gg_can_btm_ring_overmold/gg_can_btm_ring |
Part Number | NTT-304-29-3 |
Material | PSA |
No. of Cavities | 1+1 |
Mold standard | LKM or equal (A,B, Ejector plate P20) Guide Pin standard is LKM |
Injection System | Cold runner/ Edge gate |
Shrinkage | 1.005 |
Mould Lead Time | 4 weeks |
2. Mould Engineering
Our engineers uses DFM/PFM for all of parts from molds to production, the molds design we will usually uses Mold flow simulation review, from mold base, steel, electrode, runner system the whole process inspection and report. Especially, the mold base, steel, runner system we asked details certificated before machining, during machining, our engineer is strictly check the process to ensure each of stages parts perfect.
Our quality team is strictly complying with ISO system procedure to control each of stages process. If our customers have any special requirement, our engineer team will consult with you priority to fix agreement specification to ensure product tolerance meet you.
3. Product Presentation:
4. Order Process:
1. Send us the drawing with specifications for the quality, mould
life and others requirments.
2. Get a quote from us with Moluld costs and basis information and
part prices.
3. Negotiation of the quality, price, material, delivery time,
payment term and others
4. Confirm and Place an order with first downpayment.
5. We will analyse with your products and provide a DFM to you for
making sure is good to make mold and producing.
6. Send mold design for customer approval before making mold
7. Order materials and begin to machining, update the manufacturing
information once a week.
8. Assemble the mold and Try out for the First samples.
9. self- inspecting and send the samples with our inspection report
to customer for confirmation
7. If the first sample comes out and satisfied, the mold finished.
If not satisfied, we will modify until meeting customer's
requirements.
8. Delivery of goods by sea or by air according customer's
requirement
5. Questions & Answers:
If you have any new inquiry, you can go ahead to send for quoting, we are pleased to show our price to you.
![]() |